Saturday, October 9, 2010

GAMUDA - MY DREAM FOR MRT (LRT)

Hi All,

I have been dreaming about having LRT which will have connection from KL to Damansara to Puchong to Kajang/Bangi area.  So i put a comment in Tun Mahathir website (http://www.chedet.co.cc/) on 25 Nov 2009.  U can read below.

For checking the originality idea:

1. open http://www.chedet.co.cc/
2. click on Oct 2009
3. open page Buses For Rapid KL
4. Look at comment no.2.





This is so amazing that after i put my thought, somebody copy my idea, do possibility study in 9 months (Nov 2009 - July 2010) then come out with the proposal for MRT project that amounted to RM 36 billion (full project at a cost of RM 50 billion)  without consent that this is my idea that i write it in 4.32 am on 25 Nov 2009.  I believe my idea is valued at RM 10 millions.  It is small money compare to RM 50 billions that GAMUDA/MMCCORP proposed.

Saturday, July 24, 2010, 01.34 AM

Below is the news by NST that cover the MRT Project.  Read my comment on chedet website and the news by NST.  And u will know why im so interested with GAMUDA, MMCCORP and KIMLUN. TQ.

RM30b MRT PLAN
2010/06/08
By Kang Siew Li and Jeeva Arulampalam
news@nst.com.my


KUALA LUMPUR: A special task force has been set up within the Cabinet Committee on Public Transport to study a proposal for a new three-line mass rapid transit
(MRT) system costing more than RM30 billion.

Sources told the New Straits Times that Gamuda Bhd and MMC Corp Bhd had submitted a joint proposal to the government for a new MRT system to improve public transport in the Klang Valley.

While it aims to integrate the monorail and light rail transit (LRT) systems, the MRT lines will also connect the northwest and southeast of the Klang Valley.

The committee is chaired by Prime Minister Datuk Seri Najib Razak.

It is understood that one of the lines will run through Sungai Buloh, Kota Damansara, Kuala Lumpur and Cheras until Kajang. Another line will connect Sungai Buloh, Kepong, Kuala Lumpur and Serdang. The third line will loop around
{};
believed that Malaysian Resources Corp Bhd may have to redesign an upcoming development to facilitate this MRT line.

“The MRT lines will be mostly underground with stops every 500m to 1km in high-traffic areas like the Golden Triangle in Kuala Lumpur. The concept is similar to the MRT systems in Hong Kong and Singapore,” said a source



PREDICTION

GAMUDA

There is no indication for confirm rebound of GAMUDA except it is trading at 20ma support and forming of doji candlestick.  It is wise to wait for tuesday before u trading.  Another thing is 15 Oct 2010, budget 2011 will be presented by PM, so watch carefully on Monday.   


MMCCORP

White doji candlestick at 20ma support, vol 50ma high, stochastic presentable, momentum good, acc/dist about to going up, the only problem is MACD histogram still red.  So, if up 10 sen on monday, i figure that u can bet it.  Stop loss should be handy in case u need it. 


KIMLUN

My advice for u, KIMLUN have charted new historical high, MACD green for so many days, stochastic at oversold, momentum also high.  A bit risky if u want to trade on monday or tuesday since crowd definitely will take profit on KIMLUN and put it in GAMUDA or MMCCORP.  Look here..



 

1 comment: